The project is located in Sulawesi Island, Indonesia. The first phase of the construction plan is 4x36MVA high carbon ferrochrome. The conveyor adopts truss structure, which ensures the smooth transportation of materials and no leakage of materials. The middle part of the conveyor adopts the large corridor encapsulation structure, and both sides and the middle have maintenance walkways to facilitate customer maintenance.
BELT CONVEYOR FOR HCFeCr IRON ARC FURNACE IN INDONESIAN